| EMPLOYER | : | Kar Grup |
| PROJECT NAME | : | Erbil Rafineri 2. Phase |
| PROJECT LOCATION / DATE | : | Erbil – Iraq / 2010 |
| PROJECT DURATION | : | 270 Days |
| PROJECT DETAIL | : | 3 X 10.000 m³-1 X 6.000 m³-6 X 3.000 m³-1 X 2.000 m³-2 X 500 m³-2 X 250 m³-1 X 100 m³ Storage tanks with a total capacity of 57,600 m³. Manufacturing-Assembly-Painting-Cathodic protection-Insulation-Grounding Lighting-External floating ceiling-Fire system and tank instruments. |