| EMPLOYER | : | KAR GRUP |
| PROJECT NAME | : | Erbil Rafineri 4. Faz |
| PROJECT LOCATION / DATE | : | Erbil – Iraq / 2015 |
| PROJECT DURATION | : | 300 Days |
| PROJECT DETAIL | : | 5 X 20.000 m³-4 X 12.000-2 X 10.000 m³-2 X 7.000 m³-2 X 6.000 m³-2 X 5.000 m³-1 X 4.000 m³-2 X 3.000 m³-3 X 1.500 m³-1 X 500 m³-1 X 200 m³ Storage tanks with a total capacity of 220,000 m³. Manufacturing-Assembly-Painting-Cathodic protection-Grounding-Lighting-External floating ceiling-Insulation-Fire system and tank instruments. |