| EMPLOYER | : | United Enerji Falcon |
| PROJECT NAME | : | Turnkey Storage Facility |
| PROJECT LOCATION / DATE | : | Erbil – Iraq / 2014 |
| PROJECT DURATION | : | 180 Days |
| PROJECT DETAIL | : | 1 X 1.500 m³-2 X 1.000 m³-1 X 500 m³ Storage tanks with a total capacity of 4,000 m³. Manufacturing-Assembly-Painting-Cathodic protection-Grounding-Lighting-Fire system and tank instruments. 4 tanker filling and 4 tanker discharge islands. komple tesis mekanik-elektrik-inşaat-otomasyon-izolasyon-boya ve saha altyapı işleri. |