KAR GRUP ERBİL REFİNERY 30 PIECES TANKS CONSTRUCTION ERBİL-IRAQ 2011

KAR GRUP ERBİL REFİNERY 30 PIECES TANKS CONSTRUCTION ERBİL-IRAQ 2011
EMPLOYER:KAR GRUP
PROJECT NAME:Erbil Rafineri 3. Phase
PROJECT LOCATION / DATE:Erbil – Iraq / 2011
PROJECT DURATION:300 Days
PROJECT DETAIL:4 X 15.000 M³-3 X 13.000 M³-1 X 6.000 M³-2 X 4.250 M³-8 X 3.000 M³-5 X 2.500 M³-1 X 2.000 M³-1 X 800 M³-1 X 500 M³-2 X 250 M³-1 X 100 M³ Total Capacity of 153,900 M³ Storage Tanks. Manufacturing-Assembly-Painting-Cathodic Protection-Grounding-Lighting-External Floating Roof-Fire System and Tank Instruments.