info@silverteknik.com
+90 312 395 7617-18
Online Catalog
Homepage
Corporate
About Us
Vision & Mission
Quality Certificates
Human Resources
References
Online Catalog
Projects
In Process Projects
Finished Projects
Machine park
Pre-Production
Field Applications
Field of Activities
Industrial Plant Installations
Mechanical Assembly Work
Pre-Production
Field Applications
Assembly of Machinery Equipment
Mechanical Pipework
Electric-Automation Works
Construction Works
Pipelines Construction Works
Contact
POLTEKS AŞ. POWER PLANT CHIMNEY DISMANTLING AND INSTALLATION -DOHUK-IRAQ 2015
Home
»
Projects
»
Finished Projects
Finished Projects
872
EMPLOYER
:
Polteks AŞ.
PROJECT NAME
:
Baadre 150 Mw Power Plant
PROJECT LOCATION / DATE
:
Dohok – Iraq / 2015
PROJECT DURATION
:
120 Days
PROJECT DETAIL
:
11 Pieces of old chimney removal, 11 Pieces new chimneys and filters manufacturing and assembly, On-site construction and steel works
Similar Threads
BUEN ARITMA TANK MALZEME +İMALAT İŞİ-ABHAZYA-2021
GEMONT AŞ. SASA PTA TANK DİZAYN, İMALAT VE MONTAJ İŞLERİ- ADANA-2021
SİCİM SPA WEST QURNA – 2 PRODUCED WATER FACİLİTY PROJECT
TPAO 1 ADET 150.000 BBL KAPASİTELİ SİLİNDİRİK DİKEY TANK BORULAMA SİSTEMİ YAPIM İŞİ-BATMAN TERMİNALİ- BATMAN-2021
GLOBAL TERMİNAL 3X3600 M3 TANK İMALAT VE MONTAŞ İŞİ-DÖRTYOL-HATAY