KAR GRUP HURMALI REFINERY CRUDE OIL TANK ERBİL-IRAQ 2015

KAR GRUP HURMALI REFINERY CRUDE OIL TANK ERBİL-IRAQ 2015
EMPLOYER:KAR GRUP
PROJECT NAME:Khurmala Refinery Storage Tank
PROJECT LOCATION / DATE:Erbil – Iraq / 2015
PROJECT DURATION:120 Days
PROJECT DETAIL:1 X 25.000 m³ Crude oil storage tank with a total capacity of 25,000 m³. Manufacturing-Assembly-Painting-Cathodic protection-Grounding-Lighting-External floating ceiling-Fire system and tank instruments.