| EMPLOYER | : | Dno & Peıcc-Zagros |
| PROJECT NAME | : | Tawke Crude Oil Field |
| PROJECT LOCATION / DATE | : | Zakho – Iraq / 2007 |
| PROJECT DURATION | : | 300 Days |
| PROJECT DETAIL | : | 3 X 1.600 M³ -1 X 500 M³ Total 5,300 M³ Capacity Storage Tanks. Manufacturing-Assembly-Painting-Cathodic Protection-Grounding and Tank Instruments. 6 ”Total 13.700 Mt Well-Cpf Connection Pipeline Installation-Welding and Cathodic Protection. 12 ”Total 22.000 Mt Pipeline Installation-Welding and Cathodic Protection. |