| EMPLOYER | : | Diyar-Polteks Aş. |
| PROJECT NAME | : | 150 Mw Power Plant |
| PROJECT LOCATION / DATE | : | Dohok-Iraq / 2010 |
| PROJECT DURATION | : | 120 Days |
| PROJECT DETAIL | : | 3 X 7.500 m³ – 1 X 3.000 m³ – 1 X 1.000 m³ – 1 X 400 m³ – 4 X 200 m³ Storage tanks with a total capacity of 27.700 m³. Manufacturing-Assembly-Painting-Insulation-Cathodic protection Grounding-Lighting and tank instruments. |