KAR GRUP ERBİL REFINERY 17 PIECES TANKS CONSTRUCTION ERBİL-IRAQ 2010

KAR GRUP ERBİL REFINERY 17 PIECES TANKS CONSTRUCTION ERBİL-IRAQ 2010
EMPLOYER:Kar Grup
PROJECT NAME:Erbil Rafineri 2. Phase
PROJECT LOCATION / DATE:Erbil – Iraq / 2010
PROJECT DURATION:270 Days
PROJECT DETAIL:3 X 10.000 m³-1 X 6.000 m³-6 X 3.000 m³-1 X 2.000 m³-2 X 500 m³-2 X 250 m³-1 X 100 m³ Storage tanks with a total capacity of 57,600 m³.
Manufacturing-Assembly-Painting-Cathodic protection-Insulation-Grounding Lighting-External floating ceiling-Fire system and tank instruments.