{"id":574,"date":"2020-06-10T00:56:48","date_gmt":"2020-06-09T21:56:48","guid":{"rendered":"http:\/\/silverteknik.com\/?p=574"},"modified":"2021-03-28T23:53:35","modified_gmt":"2021-03-28T20:53:35","slug":"poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli","status":"publish","type":"post","link":"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/","title":{"rendered":"POA\u015e DER\u0130NCE PUMP STATION AND PIPELINES REVISION WORKS DER\u0130NCE-KOCAEL\u0130 2008"},"content":{"rendered":"\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong><strong><strong>EMPLOYER<\/strong><\/strong><\/strong><\/td><td><strong>:<\/strong><\/td><td>POA\u015e<\/td><\/tr><tr><td><strong><strong><strong>PROJECT NAME<\/strong><\/strong><\/strong><\/td><td><strong>:<\/strong><\/td><td>Derince Terminal Manifold and Betterment-Works<\/td><\/tr><tr><td><strong><strong><strong>PROJECT LOCATION \/ DATE<\/strong><\/strong><\/strong><\/td><td><strong>:<\/strong><\/td><td>Kocaeli \/ 2008<\/td><\/tr><tr><td><strong><strong><strong>PROJECT DURATION<\/strong><\/strong><\/strong><\/td><td><strong>:<\/strong><\/td><td>180 Days<\/td><\/tr><tr><td><strong><strong><strong>PROJECT DETAIL<\/strong><\/strong><\/strong><\/td><td><strong>:<\/strong><\/td><td>White product manifold-pump assemblies and mechanical piping works.<br>Black oil manifold-pump assemblies-mechanical piping-steel pipe bridges and insulation works<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<figure class=\"wp-block-gallery columns-5 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21-1024x614.jpg\" alt=\"\" data-id=\"2467\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/2-21\/\" class=\"wp-image-2467\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/2-21.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1-1024x614.jpg\" alt=\"\" data-id=\"2468\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/5-1-1\/\" class=\"wp-image-2468\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-1-1.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1-1024x614.jpg\" alt=\"\" data-id=\"2469\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/5-2-1\/\" class=\"wp-image-2469\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-2-1.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1-1024x614.jpg\" alt=\"\" data-id=\"2470\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/5-3-1\/\" class=\"wp-image-2470\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-3-1.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1-1024x614.jpg\" alt=\"\" data-id=\"2471\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/5-4-1\/\" class=\"wp-image-2471\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-4-1.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7-1024x614.jpg\" alt=\"\" data-id=\"2472\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/5-7\/\" class=\"wp-image-2472\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/5-7.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6-1024x614.jpg\" alt=\"\" data-id=\"2473\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/6-6-2\/\" class=\"wp-image-2473\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/6-6.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6-1024x614.jpg\" alt=\"\" data-id=\"2474\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/7-6-2\/\" class=\"wp-image-2474\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6-1024x614.jpg 1024w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6-300x180.jpg 300w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6-768x461.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/7-6.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"788\" height=\"1024\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1-788x1024.jpg\" alt=\"\" data-id=\"2475\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/8-1-1\/\" class=\"wp-image-2475\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1-788x1024.jpg 788w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1-231x300.jpg 231w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1-768x998.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-1-1.jpg 1000w\" sizes=\"auto, (max-width: 788px) 100vw, 788px\" \/><\/a><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"788\" height=\"1024\" src=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1-788x1024.jpg\" alt=\"\" data-id=\"2476\" data-full-url=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1.jpg\" data-link=\"https:\/\/silverteknik.com\/en\/2020\/06\/10\/poas-derince-pompa-istasyonu-ve-boru-hatlari-revizyon-isleri-derince-kocaeli\/8-2-1\/\" class=\"wp-image-2476\" srcset=\"https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1-788x1024.jpg 788w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1-231x300.jpg 231w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1-768x998.jpg 768w, https:\/\/silverteknik.com\/en\/wp-content\/uploads\/2021\/03\/8-2-1.jpg 1000w\" sizes=\"auto, (max-width: 788px) 100vw, 788px\" \/><\/a><\/figure><\/li><\/ul><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>EMPLOYER : POA\u015e PROJECT NAME : Derince Terminal Manifold and Betterment-Works PROJECT LOCATION \/ DATE : Kocaeli \/ 2008 PROJECT DURATION : 180 Days PROJECT DETAIL : White product manifold-pump assemblies and mechanical piping works.Black oil manifold-pump assemblies-mechanical piping-steel pipe bridges and insulation works<\/p>\n","protected":false},"author":1,"featured_media":585,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[],"class_list":["post-574","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-finished-projects"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/posts\/574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/comments?post=574"}],"version-history":[{"count":8,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/posts\/574\/revisions"}],"predecessor-version":[{"id":2477,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/posts\/574\/revisions\/2477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/media\/585"}],"wp:attachment":[{"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/media?parent=574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/categories?post=574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/silverteknik.com\/en\/wp-json\/wp\/v2\/tags?post=574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}